Google Search
Driveway/bus loop to close for repaving

The bus loop/driveway in front of UTSC will close Wednesday, Aug 15 for repaving. The work is expected to take four days, with reopening scheduled for Aug. 20.

The driveway, which runs parallel to Military Trail in front of the Athletic Centre, will be closed to pedestrian and vehicular traffic. Guest and student drop-offs should take place in the main drop-off loop, in front of the Arts & Administration building. Commercial deliveries to the S-wing and Studence Centre loading docks will be permitted only under the direction of a flag-person.

In preparation for this disruption, transit service to the campus was diverted as of July 26, 2012. Please see the following link for information relating to transit disruptions http://ose.utsc.utoronto.ca/ose/story.php?id=3741&sectid=1.

 For more information please contact Hovan Stepanian at hstepanian@utsc.utoronto.ca.

 




© University of Toronto Scarborough